MIL-DTL-382E
4. VERIFICATION
TABLE IV. Requirement/verification cross reference matrix.
Method of verification
Classes of verification
1 Analysis
A First article
2 Demonstration
B Conformance
3 Examination
4 Test
Section 3
Verification
Verification
Section 4
Description
Requirement
Methods
Class
Verification
1234
A
B
3.1.1
First article
XXXX
X
4.2
3.1.2
Conformance
XXXX
X
4.3
3.2
Material
X
XX
X
X
4.5.1
3.3.1
Form - Type I
X
X
X
4.5.2
3.3.2
Form - Type II
X
X
X
4.5.2
3.3.3
Form - Type III
X
X
X
4.5.2
3.4
Chemical composition
X
X
X
4.5.3
3.4.1
Magnesium
X
X
X
4.5.3.1
3.4.2
Volatile material at
4.5.3.2
X
X
X
105°C
3.4.3
Oil and grease
X
X
X
4.5.3.3
3.4.4
Total Fe
X
X
X
4.5.3.4
3.4.5
Carbides
X
X
X
4.5.3.5
3.5
Granulation
X
X
X
4.5.4
3.6
Apparent density
X
X
X
4.5.5
3.7
Workmanship
X
X
X
4.5.6
3.8
Process verification
X
X
X
4.5.7
4.1 Classification of inspections. The inspection requirements specified herein are
classified as follows:
a.
First article (see paragraph 4.2)
b.
Conformance (see paragraph 4.3)
4.2 First article inspection. When specified, a sample shall be subject to first article
verification in accordance to Table V.
4.2.1 First article quantity. The first article sample shall be 10 kilograms of metal powder
from the first production lot produced by the contractor using the same production equipment,
process procedures, and material supply sources as will be used in regular production.
7
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business