MIL-DTL-10866E
4. VERIFICATION
4.1 Classification of inspection. The inspection requirements specified herein are
classified as a conformance inspection (see 4.2).
4.2 Conformance inspection.
4.2.1 Lotting. A lot shall consist of one class of urea produced by one manufacturer, at
one plant, from the same materials, and under essentially the same manufacturing conditions,
provided the operation is continuous. In the event the process is a batch operation, each batch
shall constitute a lot (see 6.3).
4.2.2 Sampling.
4.2.2.1 Sampling for examination of preparation for delivery. Sampling shall be
conducted in accordance with MIL-STD-1916 verification level I.
4.2.2.2 Sampling for test. Sampling shall be conducted in accordance with table II. A
representative specimen of approximately 200 grams shall be removed from each sample
container and placed in a suitable clean dry container labeled to identify the lot and container
from which it was taken.
TABLE II. Sampling for test.
Number of
Number of
containers in
sample
batch or lot
containers
2 to 25
2
26 to 150
3
151 to 1,200
5
1,201 to 7,000
8
7,001 to 20,000
10
Over 20,000
20
4.2.3 Inspection procedure.
4.2.3.1 Inspection for examination of preparation for delivery. The sample unit shall be one
filled container ready for shipment. Sample containers and the preparation for delivery thereof
shall be examined for the following defects in accordance with MIL-STD-1916 verification level I:
a.
Contents per container not as specified.
b.
Container not as specified.
c.
Container closure not as specified.
d.
Container damaged or leaking.
e.
Marking incorrect, missing, or illegible.
4
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business